South Norwalk Elementary School

Scope of Work Ultimate Construction was responsible for the custom fabrication and installation of approximately 8,000 square feet of Laminators Inc. ACM cornice, shop-fabricated in-house by Ultimate Construction’s subsidiary, ASF. The cornice design consisted of a profiled ACM assembly, fabricated from single panels with multiple bends rather than flat panelized components. This required extensive field […]
SCSU School of Business

Scope of Work Ultimate Construction was responsible for the installation of approximately 12,000 square feet of Dri-Design .080″ aluminum rainscreen panels installed over Greengirt thermally broken sub-framing with continuous mineral wool insulation. The scope included highly detailed architectural features, most notably custom “sawtooth” corner conditions, window infill panels, and façade transitions that required exact coordination […]
Norwalk High School

Scope of Work Ultimate Construction’s scope includes the fabrication and installation of a multi-system exterior wall assembly totaling approximately 74,000 square feet, consisting of the following components: 2,500 SF of 4mm Reynobond aluminum composite material (ACM) panels, shop-fabricated in-house by ASF 60,000 SF of Morin Matrix Series 22-gauge metal wall panels, including custom shop-fabricated mitered […]
Danbury High School West Campus

Scope of Work Ultimate Construction was responsible for the installation of approximately 37,000 square feet of aluminum rainscreen panels, recladding an existing structure originally constructed with insulated metal wall panels. All exterior walls were existing, making this project a true recladding retrofit rather than new construction. Due to variations in building geometry, window elevations, and […]
Loomis Chaffee Nichols Center

Scope of Work Ultimate Construction was responsible for the fabrication and installation of approximately 1,600 square feet of 4mm Reynobond ACM panels. Fabrication was completed in-house by ASF, enabling tight quality control and efficient coordination between shop production and on-site installation. The scope required precise layout and sequencing due to limited site access and staging […]
University of Hartford Hursey Center

In 2021, Ultimate Construction was selected by Whiting-Turner to deliver the full exterior panel
Pleasant Valley Elementary School

A vibrant educational space designed for growth and community impact. Pleasant Valley
Two Roads Area Two Experimental Brewing

A dynamic commercial project built with creativity in mind. Two Roads exemplifies our ability to deliver complex
Maritime Center of Excellence

A dynamic commercial project built with creativity in mind. Two Roads exemplifies our ability to deliver complex